banner

PCBA for Agricultural Machines

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2017-07-12 13:32

  • Browse the number:

    67

Send an inquiries
Company Profile
Top Electronic (SZ) Co., Limited
By certification [File Integrity]
Contact:

topelec(Mr.)  

Telephone:

Area:

Beijing

Address:

A Building, Jing Yuan Industrial, Park, Shajing Town, Baoan District, Shenzhen, Guangdong, China (518000)

Website: http://topelec.marbella-taxi.com/
Product details
Model Number: PCBA-TOP-903A-#6654 Brand Name: TOPCBA Key Specifications/Special Features: *Quick DetailsPlace of Origin:Guangdong, China (Mainland)Brand Name:TOPCBAOne-stop turnkey services for contract electronic manufacturing:PCBA, PCB assembly: SMT, PTH and BGAElectronic components sourcing and purchasingPCA test: AOI, in-circuit test (ICT), functional test (FCT)Plastic enclosures and metal enclosures design and developmentMold, die design and constructionRapid prototyping
Plastic injection molding
Metal sheet stamping
Final product assembly
Customized clearance for material importing and product exporting

PCB assembly production flow:

Material receiving-IQC-stock-material to SMT-SMT line loading-solder paste/glue printing-chip mount-reflow-100% visual inspection-automated optical inspection (AOI)-SMT QC sampling-SMT stock-material to PTH-PTH line loading-plated through hole-wave soldering-touch up-100% visual inspection-PTH QC sampling-in-circuit test (ICT)-final assembly-functional test (FCT)-packing-OQC sampling-shipping

Requested information for PCB assembly:

Gerber files
Bill of material
Testing guide and test fixtures
Programming files and programming tool
Schematic files if necessary
*Packaging & Delivery

Packaging Details: plastic bag, Electrostatic bag packing
Delivery Detail: 3-4days
Shipping Information:
  • FOB Port: Shekou Shenzhen
  • Lead Time: 3 - 5 days
Main Export Markets:
  • Asia
  • Australasia
  • Central/South America
  • Eastern Europe
  • Mid East/Africa
  • North America
  • Western Europe
New Products